In Denmark, we see wastewater as a resource. Carbon, heat energy, sludge and treated wastewater must be optimally utilized and the nutrients in the wastewater must be reused.  

Hillerød Utility started in 2013 on the establishment of WWTP HCR Syd - a green wastewater treatment plant (capacity 100,000 PE) with ambitious goals.  

The plant was built on a number of principles:  

  • Positive net energy
  • CO2 neutrality  
  • Optimal use of resources  
  • Symbiosis between private and public institutions  
  • Integration of the facility into natural surroundings with public access 
  • Environmental care is of high importance 

The facility was commissioned in 2018. 

HCR Syd, Hillerød Forsyning, renseanlæg

Download materials

Introduction to HCR Syd: Green WWTP with ambitious goals

Read the story about the establishment of Denmark's first covered wastewater treatment plant.

Fact sheet and flowchart for WWTP HCR Syd

Downloads all the facts about HCR Syd.

Separation of rainwater in Hillerød City Centre

Hillerød City Centre is a strategic project, which
addresses the urgent need to fulfil the Action Plan
for the Aquatic Environment, under the EU Water
Framework Directive.

Cleaning for pharmaceuticals and reduction of N2O

Pilotplant with ozonation and granular activated carbon (GAC) filtration.